Frames
Infrastructure
During the planning phases of
- test benches
- test facilities or
- entire test fields
we define early onÂ
- the requirements for the supply technology
- the interfaces
and
loads on the construction.
As part of the onsite management, we monitor the execution of the technical equipment for compliance with
- execution planning
- the relevant regulations and
- generally accepted technical rules.
Depending on the requirements, (interim) measures such as temporary electrical or cooling/cold water supply are initiated.