Frames

Infrastructure

During the planning phases of

  • test benches
  • test facilities or
  • entire test fields

we define early on 

  • the requirements for the supply technology
  • the interfaces

and

loads on the construction.

As part of the onsite management, we monitor the execution of the technical equipment for compliance with

  • execution planning
  • the relevant regulations and
  • generally accepted technical rules.

Depending on the requirements, (interim) measures such as temporary electrical or cooling/cold water supply are initiated.